2nd Mississippi Drive Engagement Event Was a Success!

This slideshow requires JavaScript.

Thank you to everyone who participated in the 2nd public engagement event for the Mississippi Drive Corridor Project! We were pleased with the attendance and high level of participation by community members. The event was held on Tuesday, Nov. 10 at the Riverview Center. There were about 175 people who came to hear about potential design plans and provide feedback in a public opinion poll.

If you were unable to attend and would like to take a look at initial design concepts and submit feedback, you may do so at our engineering firm Bolton & Menk’s website: http://bolton-menk.com/mississippidrive.

The Mississippi Drive Corridor Project is exciting for Muscatine! Not only will the road be redone, but Muscatine will be better connected as a result of this project. Mississippi Drive is the key connector of downtown and the riverfront. As our community comes together to create a shared vision for the future of Mississippi Drive, we are connecting in a meaningful way. We are working together to improve Muscatine!